Contact Details

Suir Plant Ltd.
Owning, Piltown, Co. Kilkenny
Phone: +353 51 643 229
Mobile: 087 655 4722

Our Services

Suir Plant Ltd has developed to become a principal contractor of civil engineering projects and has been involved in some significant civil engineering projects in Ireland. Suir Plant Ltd services includes but is not limited to the list below:

Water

  • Mains Installations
  • Mains Upgrades
  • Treatment Plant Upgrades
  • Pump Station Installations & Upgrades
  • Reservoir Construction & Installation

Sewer

  • Mains Installations
  • Mains Upgrades
  • Treatment System Installations
  • Percolation Installation
  • Treatment Plant Upgrades
  • Pump Station Installations & Upgrades
  • Pump Sump Installation & Commissioning
  • Storage Chamber Installation
  • Macerator Installation

Gas

  • Mains Installations
  • Mains Upgrades

Roads

  • Drainage Works
  • Traffic Calming
  • Road Furniture Installations
  • Road Widening
  • Road Signage Installation

Trenchless Technology

  • Directional Horizontal Drilling
  • Pipe Bursting
  • Slip Lining
  • Dye Reduction Lining
  • Moling
  • Mole Ploughing

Water Conservation

  • Leak Detection
  • Leak Repair
  • Flow Metre Installation & Commissioning
  • Pressure Reducing Installation & Commissioning

Site Development

  • Demolition
  • Bulk Earth moving
  • Drainage
  • Dredging
  • Foundations
  • Landscaping
  • Land Reclamation
  • Pipe laying
  • Ground works

Fencing

  • Palisade
  • Paladin
  • Concrete
  • Concrete Posts & Rail
  • Concrete Post & Wire
  • Timber Post & Rail
  • Timber Post & Wire

Cutting & Core Drilling

  • Road Sawing
  • Concrete Coring

Concrete Works

  • Dam Construction
  • Culvert Installations
  • Footpaths
  • Concrete Yards
  • Concrete Walls
  • Stone Walls
  • Block Walls
  • Head Walls
  • Kerb Laying
  • Slip form Kerbing

Plant Hire

  • Wheeled Excavators
  • Tracked Excavators 1Ton -20 Ton
  • Dumpers 1 Ton – 6 Ton
  • Rock Breaking 1 Ton – 20 Ton
  • Tractor & Dump Trailers
  • Low Loader Works
  • Lorries
  • Rollers
  • Compactors
  • Lighting Towers
  • Compressors
  • Hedge Cutting

Iron Work for Roads

  • Supply of covers & Frames
  • Installation with Mastic Asphalt
  • Adjustment with Mastic Asphalt

Utility Services

  • Water
  • Sewage
  • Gas
  • Rope & Cable Installation
  • Ducting Installation
  • Lighting Column Installation

Health & Safety

  • Project Supervisor for Design Process (PSDP)
  • Project Supervisor for Construction Stage (PSCS)
  • Contractor

All the above roles are carried out in compliance with:

  • Safety Health & Work Act 2005
  • Safety Health & Welfare at Work Act (General Application) Regulations 2007
  • Safety Health & Welfare at Work (Construction) Regulations 2013
  • Safety Health & Welfare at Work (Confined Space) Regulations 2001

We deliver all projects in accordance with the following standards:

Quality ISO 9001  | Environmental ISO 14001  |  Health & Safety OHSAS 18001